How-to

Add and assign an asset

Last updated October 10, 2025 · Tushar Agarwal

On this page

HRStop lets you define, manage, and track company assets, including detailed descriptions and assignments. You can:

  • Add individual assets
  • Assign assets to employees
  • Request returns
  • Import assets in bulk using the Import option

Two ways to add assets

HRStop gives you two options to add assets:

  1. Add Asset (Manual Entry) – For adding assets individually with detailed information.
  2. Import Assets (Bulk Entry) – For adding multiple assets at once using a CSV file.

Use this link to add assets in bulk: https://hrstop.thedocs.in/31/-Adding-an-asset-in-bulk

You can also assign assets to employees, track returns, and maintain detailed asset records.


1. Add Asset (manual entry)

You can add assets one by one using the Add Asset option. This is suitable for smaller batches or when detailed information is required for each asset.

Steps to add an asset

  1. Navigate to: Control Panel → Assets → View/Add
  2. Click the + Add button (top-right corner) to open the asset creation page.

Note: Adding an asset is divided into three main sections: Add Asset, Procurement Details, and Assign Asset.


Add Asset section

  • Asset Category: Select the type of asset
  • Brand: Choose the asset brand. If it is not listed, select Other and enter the brand name; the system creates it automatically.
  • Title: Auto-populated based on the selected category; editable if required
  • Description: Optional detailed description of the asset
  • Location: Specify where the asset is stored
  • Asset Code:
    • Code 1: Unique code (recommended: product serial number)
    • Code 2: Auto-generated based on the category pattern; editable if needed
  • Life Stage: Select the current status:
    • New: Brand new asset
    • Working: In good working condition
    • Not Working: Malfunctioning but potentially repairable
    • Dead: Fully non-functional
  • Next Service Date: Enter the next service schedule
  • Picture: Upload an image of the asset
  • Document: Upload related documents (warranty, insurance, guarantee certificates)
  • Notes: Internal notes visible only to admins

Procurement Details section (optional)

  • Vendor Name: Vendor from whom the asset was purchased
  • Purchase Date: Date of purchase
  • Warranty End Date: Expiration of warranty
  • Cost: Purchase cost
  • Invoice Number: Invoice reference number
  • Upload Invoice: Upload the invoice file

Assign Asset section (optional)

  • Select Employee: Assign the asset to an employee
  • Issued On: Date of issuance
  • Expected Return Date: Expected asset return date
  • Comments: Any additional notes or information

Save the asset

  • Click Save to add the asset.
  • Click Save and Add More to continue adding multiple assets.

Tip: You can create custom fields to capture additional information (e.g., for a CPU: model, RAM, warranty, color, processor type).


2. Import assets (bulk entry)

To add multiple assets at once, use the Import option. This is useful when handling large batches of assets or migrating data from other systems.

Learn how to import assets in bulk here: https://hrstop.thedocs.in/31/-Adding-an-asset-in-bulk

Frequently asked questions

Can I generate barcodes for assets after creation?

Yes, you can generate and print barcodes at the time of asset creation or later.

Steps:

  1. Go to Control Panel → Assets → View/Add.
  2. Find the asset and click the eye icon next to the Asset Code field.
  3. The system generates a barcode based on the asset code.
  4. Download and print the barcode to stick on the asset.
What are Asset Life Stages and when should I use them?

Asset Life Stages represent the current condition or usability of the asset.

Life StageWhen to Use
NewJust procured and not yet assigned
WorkingCurrently in use by an employee
Not WorkingNeeds repair or maintenance
DeadNon-functional and beyond repair

Life stages help filter assets for reporting and replacement planning.

Can I assign an asset while adding it?

Yes, you can assign assets during the creation process.

Steps:

  1. While adding an asset (Add Asset page), scroll to the Assign To section.
  2. Select the employee from the list.
  3. Enter the Issue Date and Expected Return Date.
  4. Add comments (optional).
  5. Click Save.

This saves time by assigning assets right at the time of creation.

What happens when I release an asset?

Releasing an asset detaches it from the currently assigned employee, making it available for reassignment. This is commonly used when:

  • An employee leaves the company
  • Assets are no longer needed
  • Devices are collected for servicing or reallocation

To release an asset:

  1. Navigate to Assets → View/Add.
  2. Find the asset currently assigned.
  3. Click the Release icon (usually next to the asset).
  4. Enter a reason/comment if needed and confirm.

The asset’s status changes to Unassigned, and it can be reassigned or moved to a different live stage.

Can I change the asset’s return date after assignment?

Yes. If the expected return date changes due to project extension or employee retention, you can update it easily.

To change the return date:

  1. Go to Assets → View/Add.
  2. Search for the asset in question.
  3. Click the Change Return Date icon.
  4. Enter the new return date and provide a reason or note (optional).
  5. Click Save.

The new date is reflected in reports and reminders accordingly.